RadonPlans

IRC Appendix BE: Radon Control Methods

2024 IRC, Appendix BE

Appendix BE is the radon control methods appendix in the 2024 International Residential Code. Like every edition before it, inclusion is not automatic: a jurisdiction has to adopt the appendix, or determine the project sits in a designated radon Zone 1, before its provisions apply to a permit.

The appendix number has changed across code cycles even where the underlying requirements carried forward largely unchanged: it was Appendix F through the 2018 IRC, renumbered Appendix AF in the 2021 IRC, and is Appendix BE in the 2024 IRC. A jurisdiction that references “Appendix F” or “Appendix AF” in its own adopted code is not citing a different requirement, only an earlier edition's number for it, and reading the wrong edition's number as the wrong requirement is a real way to draw the wrong permit set. Check our jurisdiction adoption map for which edition and appendix number a given jurisdiction has actually adopted.

In the code's own words

“Inclusion of this appendix by jurisdictions shall be determined through the use of locally available data or determination of Zone 1 designation in Figure BE101.1 and Table BE101.1.”

2024 IRC, Appendix BE, Section BE101 — source

“Openings around bathtubs, showers, water closets, pipes, wires or other objects that penetrate concrete slabs, or other floor assemblies, shall be filled with a polyurethane caulk or equivalent sealant.”

2024 IRC, Appendix BE, Section BE103.4.1 — source

Where this fits our packages

Our single-family rough-in packages are drawn to satisfy the entry-route sealing, sub-slab, and vent pipe provisions Appendix BE sets out, cited to the edition your jurisdiction has actually adopted rather than assumed by default.

Get a quote for your project

Send us your building plans and we return a fixed quote for a permit-ready radon rough-in package, reviewed against the code your plans examiner checks.