RadonPlans

Saskatchewan radon requirements for new construction

National Building Code of Canada 2020 (adopted by regulation under the Construction Codes Act), Subsection 9.13.4In force since January 1, 2024

What your permit set must show

  • Saskatchewan adopted the National Building Code of Canada 2020 edition by regulation under the Construction Codes Act, effective January 1, 2024, carrying forward the radon rough-in provision at NBC Subsection 9.13.4.
  • Requires a rough-in stub pipe (as with BC, Alberta, and Ontario, sized for sub-slab or sub-membrane depressurization) in new Part 9 residential buildings, applied province-wide with no exemption found.
  • Requirement applies to all new Part 9 (small residential) buildings under the current NBC 2020 edition.

Common questions

Does every new Saskatchewan home need a radon rough-in?

Yes. NBC 2020's Subsection 9.13.4, adopted province-wide effective January 1, 2024, applies to all new Part 9 residential buildings with no exemption found.

Is this the same requirement as BC and Alberta?

Substantively yes — all three provinces mandate the same NBC 9.13.4 rough-in provision, though each cites its own provincial adoption regulation and code edition.

Get notified when we cover Saskatchewan

Join the waitlist and we will email you the moment Saskatchewan is available.