Connecticut radon requirements for new construction

2022 CT State Building Code, Appendix AF

What your permit set must show

  • Connecticut adopted 2021 IRC Appendix AF ("Passive Radon Gas Controls") into the 2022 CT State Building Code, applying it statewide to all new detached one- and two-family dwellings and townhouses.
  • The requirement was originally adopted as Appendix F in the 2016 CT code and carried forward under the current Appendix AF numbering in the 2022 code cycle.
  • Appendix AF carries the same substantive rough-in components as the current Appendix BE numbering: sub-slab depressurization piping, a sealed soil-gas barrier, and sealed floor penetrations.

Common questions

Does every new Connecticut home need a radon rough-in?

Yes, for detached one- and two-family dwellings and townhouses. The 2022 CT State Building Code incorporates 2021 IRC Appendix AF statewide, with no county-level exemption.

Why does Connecticut cite Appendix AF instead of Appendix F or BE?

Connecticut's current code cycle (2022) uses the 2021 IRC edition's numbering, Appendix AF. The requirement was originally adopted as Appendix F in the 2016 CT code and carries the same substantive provisions under the newer number.